热门标签

最新博彩网址(www.99cx.vip):TNB, PETRONAS to collaborate on joint feasibility studies on hydrogen and carbon capture

时间:3周前   阅读:1   评论:3

博彩平台推荐www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。博彩平台推荐上最新博彩平台推荐登录线路、博彩平台推荐代理网址更新最快。博彩平台推荐开放皇冠官方会员注册、皇冠官方代理开户等业务。

KUALA LUMPUR: Tenaga Nasional Bhd (TNB) intends to work with Petroliam Nasional Bhd (Petronas) on joint feasibility studies in the areas of hydrogen and carbon capture with a view to unlocking the commercial value of at least RM10 billion up to 2035, said TNB president and chief executive officer Datuk Baharin Din today.

The decarbonisation efforts would be achieved mainly through a collaborative study to develop a green hydrogen ecosystem and carbon capture and storage (CCS) technology, leveraging both organisations' technical expertise and resources.

In addition, the two companies will repower the retired combined-cycle gas-fired power plant, the Sultan Ismail Power Station (SIPS) in Paka, Terengganu by using gas with hydrogen-ready technology, said Baharin in a statement today.

TNB will be investing RM6.3 billion in the repowering of SIPS using high-efficient Combined Cycle Gas Turbine (CCGT) with hydrogen-ready technology for cleaner energy production.

Baharin said the repowering of the plant will leverage the strengths of both TNB and Petronas; and will serve as a unique pioneering project in deploying green technologies that may be utilised in future power plants.

"This brownfield project will start with the demolition of the existing plant next year and this will take two years. Construction of the project will commence from 2025 and the entire complex is scheduled to be ready in 2030,” he added.

,

最新博彩网址www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。最新博彩网址上线上最新博彩网址会员登录线路、最新博彩网址代理网址更新最快。最新博彩网址开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Upon commercial operation of the plant in 2030, the repowered Paka is projected to generate an average of RM250 million per year in earnings before interest and taxes.

"The repowering of Paka, with a capacity of 1,400 megawatts (MW) will avoid 3.2 million tonnes of carbon dioxide equivalent emission per annum, which is equivalent to the CO2 emitted by approximately 700,000 cars each year,” said Baharin.

As the country’s leading energy corporations, Baharin said TNB and Petronas have been forging cooperation for decades in the development of the energy sector and the betterment of the country.

Both TNB and Petronas have signed a memorandum of understanding (MoU) inked by both on Aug 19 to strengthen collaboration in driving innovative solutions toward decarbonisation, making it a historical milestone in supporting Malaysia’s aspiration to be a carbon-neutral nation by 2050.

"The MoU signals the recognition that our paths must converge, in order to realise a successful and inclusive energy transition for Malaysia. TNB has identified two technologies that will bring sustainable decarbonisation to our thermal assets and these are green hydrogen and carbon capture technologies,” said Baharin.

He added that TNB’s MoU with Petronas formed part of TNB’s accelerated Responsible Energy Transition, which is driven by Petronas' aspiration to be net zero by 2050 and the TNB’s target to reduce its coal capacity by 50 per cent and carbon emission intensity by 35 per cent in 2035.

上一篇:免费足球推荐(www.ad168.vip):“造节火不过三季”?《开心消消乐》给出了不一样的答案

下一篇:新2正网代理开户(www.hg108.vip):Improve quality of national schools, says Dr Mahathir

网友评论

  • 2022-11-13 00:53:07

    He has received recognition for his entrepreneurship and outstanding achievements, and was the top nominee of the Ernst & Young’s (EY) Entrepreneur of the Year in 2013, 2014 and 2020.离不开你啦!